Description
Performance testing
PULL OUT TEST: Measured using slow set-time resin, 300mm encapsulation length using 21.7mm core diameter high tensile grade bolts in a 28mm diameter hole, the typical peak pull-out load is greater than 250kN.
*using 2.1m AXR bolt with 1200mm TORQ cartridge PUNCH SHEAR TEST: Measured using a slow set-time resin in accordance with BS2782 (Part 3), the typical peak punch shear test is greater than 20kN. RESIN INSTALLATION SPEED: The total installation time for a 1200mm long TORQ resin capsule with a 2.1m long AXR bar is typically 13 to 16 seconds (strata condition dependent). This time includes the following installation steps: pushing through the resin while rotating the bolt, continued rotation at the back of the drill hole, “stalling” of the drill motor, nut breakout, and nut travel and pre-tension application. These installation steps are shown below.